Remaining Civil works of Lorestan B1, LLDPE/HDPE Petrochemical Complex
Location Lorestan Province, Iran …
Yazd Province, Iran
From the early days of Assaluye’s journey on the path to becoming one of the major economic zones in Iran, Navrood had a prominent presence in its development projects at different sectors.
One such area was the construction of more than 100 km of its urban roads, and over 12 km of its highways, which had a major impact on the efficient transportation of goods and people between the widespread industrial complexes in the area, such a refineries, petrochemical complexes, and all other establishments in the city.
The construction work involved some challenging terrain, such as impassable quagmires – for which special ground stabilization methods such as quick lime were employed – or the mountainous and rugged regions.
During the course of their execution, more than 200 different equipment and machinery were deployed to ensure successful and on-time completion of these strategic projects.
The projects also involved the construction of infrastructures, superstructures, interchange bridges, several big bridges, and buildings.
The commitment of Navrood to the quality of work, to the safe execution of projects, to the protection of the environment, and to their on-time completion earned us several recognitions and awards from the Pars Special Economic Energy Zone.
Construction of 100 km of urban roads and 14 km of highway
Road embankment, superstructure, asphalt, concrete curb
Construction of infrastructures, superstructures, interchange bridge, and buildings
• Urban roads:
– Embankment: 4,000,000 m3
– Concrete pouring: 50,000 m3
– Sub-base & base: 600,000 m3
– Asphalt: 300,000 tons
– Rebar: 1000 tons
– Concrete curb: 150 km
– Bridges: 35 sets
• Highway:
– Embankment: 1,000,000 m3
– Excavation: 4,000,000 m3
– Explosion: 2,000,000 m3
– Rebar: 2,000 tons
– Formwork: 160,000 m2
– Concrete pouring: 100,000 m3
– Bridges: 50 sets
– Asphalt: 150,000 tons
Location Lorestan Province, Iran …
Location Mahabad, Iran Project …
Location Assaluye, Iran Project …
Location Assaluye, Iran Project …
Location Assaluye, Iran Project …
Location Assaluye, Iran Project …
Navroud Company started its activity in the field of road construction operations in 1360 and then entered the field of civil operations and underground pipelines in oil, gas and petrochemical projects by carrying out the Tabriz Petrochemical Project.
In 2011, Navroud Company, with the support of more than 30 years of experience and brilliant executive history, and with the aim of building capacity for independent implementation of EPC projects, formed a sub-group named Navroud Engineering and Development Company, whose main mission is to provide engineering services, engineering Purchase and supply of project goods and thus took another long step in the development path.
All rights reserved. Design and development: Noongar Pardazesh