Remaining Civil works of Lorestan B1, LLDPE/HDPE Petrochemical Complex
Location Lorestan Province, Iran …
Assaluye, Iran
In 2010, Navrood was awarded another contract by IPMI to render the remaining civil works and U/G piping works in Area 7, to do the A/G piping works on the main pipe rack, to install the flares, and to install the flare area equipments.
Even though the onset of international sanctions had a profound impact on the delivery schedule of project’s main items such as pipes, flare area equipments, and the such, Navrood did all its efforts to deliver the project with minimum disruption and delay.
A/G piping over the main pipe rack and the flare area, installation of the flares and flare area equipments, remaining civil works and U/G piping works in Area 7 (main pipe rack area)
Excavation: 21,553 m3
Concrete pouring: 4,747 m3
Rebar: 390 ton
Installation of flare area equipment (including the burner equipment): 800 ton
A/G piping: 220,000 inch-dia
Pipe support (fabrication & installation): 500 ton
Location Lorestan Province, Iran …
Location Mahabad, Iran Project …
Location Assaluye, Iran Project …
Location Assaluye, Iran Project …
Location Assaluye, Iran Project …
Location Assaluye, Iran Project …
Navroud Company started its activity in the field of road construction operations in 1360 and then entered the field of civil operations and underground pipelines in oil, gas and petrochemical projects by carrying out the Tabriz Petrochemical Project.
In 2011, Navroud Company, with the support of more than 30 years of experience and brilliant executive history, and with the aim of building capacity for independent implementation of EPC projects, formed a sub-group named Navroud Engineering and Development Company, whose main mission is to provide engineering services, engineering Purchase and supply of project goods and thus took another long step in the development path.
All rights reserved. Design and development: Noongar Pardazesh